Claremont Medical Centre

Claremont

The redevelopment provided a new medical centre and multiple retail tenancies.

The redevelopment required demolition of an existing building, the addition of a first floor, and the relocation and reconstruction of two heritage façades.

The building consists of a composite wall system, structural steel, lift, UAT, toilet services and all electrical, mechanical and hydraulic services.

This project was completed in eight months with continuous trading of existing ground floor tenant.